Case study · Blueprint

An estimate walks in, a work plan walks out.

Send the estimate file and get back the full schedule: who does what, and on which day.

How it works

AI reads the estimate line by line, groups it into stages and spreads it across a calendar: what runs at the same time, what waits for what, which permits are needed and when materials must be on site.

The numbers